Skip to main content
Industrial steel structure and foundation

Civil & Environmental

Civil, Geotechnical & Geo-Environmental

Geotechnical, hydrogeological and geo-environmental engineering for foundations, groundwater, underground construction, slope and drainage systems, contaminant transport and deep formation wastewater disposal. Strong numerical modeling and infrastructure project capability.

$4B light rail transit groundwater control work

UEI
ZR3PJZEA7A21
CAGE
174X8
Independence
Findings challenged before release
Deployment
Remote response within 24 hours

What This Discipline Covers

Scope of the technical capability.

Geotechnical, hydrogeological and geo-environmental engineering for foundations, groundwater, underground construction, slope and drainage systems, contaminant transport and deep formation wastewater disposal. Strong numerical modeling and infrastructure project capability.

  • Geotechnical engineering
  • Groundwater and hydrogeology
  • Foundations
  • Soil structure interaction
  • Slope stability
  • Drainage
  • Contaminant transport
  • Deep injection and disposal wells
  • Mine water
  • Ground improvement
  • Numerical modeling
  • Geo-environmental assessment

Problems The Technical Lead Solves

The questions this discipline is engaged to answer.

  1. 01

    Foundation and ground movement

  2. 02

    Groundwater control problems

  3. 03

    Contaminant migration

  4. 04

    Drainage and slope issues

  5. 05

    Underground construction risk

  6. 06

    Deep disposal feasibility

  7. 07

    Geo-environmental disputes

Equipment And Systems

Assets this Technical Lead has worked on directly.

  • Foundations
  • Underground stations and tunnels
  • Slopes
  • Tailings and containment systems
  • Monitoring wells
  • Injection wells
  • Industrial sites
  • Transit infrastructure

Industries And Environments

Operating environments where this experience was built.

  • Transit and infrastructure
  • Mining
  • Oil and gas
  • Chemical and industrial
  • Environmental remediation

Diagnostic And Investigation Methods

How the technical work is actually performed.

  • Structural condition survey and distress mapping
  • Load path and capacity verification
  • Geotechnical data review and settlement analysis
  • Instrumentation and monitoring programs
  • Material testing and concrete or steel evaluation
  • Environmental sampling and compliance review

Tools Capability

The platforms, instruments and measurement methods used on assignments.

These platforms, instruments and methods are used to produce evidence that holds up under audit, underwriting review and cross examination.

Geotechnical Analysis

  • PLAXIS 2D and 3D

    Finite element analysis of soil structure interaction, settlement, excavation and foundation behavior.

  • GeoStudio

    Slope stability, seepage, consolidation and thermal ground analysis.

  • Rocscience Slide2 and Settle3

    Limit equilibrium slope stability and settlement assessment in failure investigations.

Structural Analysis

  • SAP2000 or STAAD.Pro

    Structural analysis of foundations, frames and supports where distress, movement or collapse is under review.

Groundwater and Spatial Data

  • MODFLOW

    Groundwater flow and contaminant pathway modeling.

  • Esri ArcGIS Pro

    Spatial analysis, site characterization and evidence mapping.

3D Capture and Survey

  • LiDAR, terrestrial laser scanning and photogrammetry

    Deformation, settlement and as built geometry captured as measured data for analysis and exhibits.

  • Drone survey and aerial mapping

    Site wide topography, stockpile, embankment and damage extent capture in a single pass.

  • Trimble and Leica survey instrumentation

    Control survey, monitoring points and movement verification over time.

Monitoring and Instrumentation

  • Inclinometer, piezometer and settlement instrumentation

    Ground and structure movement measured continuously rather than inferred.

  • Remote and AI camera monitoring

    Automated watch on slopes, embankments and structures where movement is active.

Root Cause and Analytical Method

  • Fault tree analysis and Apollo Root Cause Analysis

    Separation of design, construction, maintenance and loading causes in a structural or ground failure.

BlackOut Power / TerraTolga Proprietary Capability

Codes And Standards

Frameworks applied to the analysis.

  • IBC and ASCE 7
  • ACI 318 and ACI 562
  • AISC 360
  • EPA and state environmental regulatory frameworks
  • ASTM D standards for soil and foundation testing

Credentials And Qualification

The professional basis for this discipline.

  1. 01

    Civil, structural, or geotechnical engineering registration

  2. 02

    Industrial and heavy structure assessment experience

  3. 03

    Environmental compliance and remediation program experience

  4. 04

    Forensic structural investigation background

Scale And Breadth

Reported scale of professional exposure.

  • 01

    $4B light rail transit groundwater control work

  • 02

    $2.1B light rail transit design and construction support

  • 03

    Deep brine and wastewater disposal well field modeling

  • 04

    Coupled groundwater, soil structure and contaminant transport modeling

Representative Professional Experience

Assignment types this discipline supports.

  1. 01

    Investigation of foundation movement affecting rotating equipment alignment

  2. 02

    Condition assessment and remaining life evaluation of industrial structures

  3. 03

    Causation analysis for structural distress following adjacent construction

  4. 04

    Environmental compliance review supporting a facility transaction

Assignment descriptions are generalized to protect client confidentiality. Specific references can be discussed during scoping where permissions allow.

Multidisciplinary Interfaces

Disciplines this work commonly coordinates with.

  • Environmental
  • Structural and Civil specialists
  • Mechanical & RCA
  • Project Controls

Discuss a civil & geotechnical assignment.

Initial conversations are confidential and without obligation. We will confirm independence before scope is discussed.

Discuss a matter in confidence