The spreadsheet describes the asset. Physical reality determines its risk.

We test investment assumptions against equipment condition, operating history, remaining life, technical performance, and the capital required to sustain value.

UEI
ZR3PJZEA7A21
CAGE
174X8
Independence
Findings challenged before release
Deployment
Remote response within 24 hours

Technical Diligence

What we evaluate before capital is committed.

  1. 01

    Physical condition

    What does direct inspection reveal about degradation, maintenance, and operability?

  2. 02

    Remaining life

    Which components constrain useful life and when will intervention be required?

  3. 03

    Performance risk

    Are output, efficiency, reliability, and availability assumptions technically credible?

  4. 04

    CAPEX exposure

    Which repairs, upgrades, obsolescence issues, or compliance needs are not visible in the model?

  5. 05

    Execution risk

    Can the proposed plan be delivered within the stated cost, outage, and schedule assumptions?

  6. 06

    Value implications

    Which findings materially affect price, structure, reserves, or investment thesis?

Spreadsheet vs. Physical Reality

A useful model must survive contact with the asset.

01

Data room assumptions

02

Field condition

03

Engineering risk

04

Transaction decision

Make the technical risk visible before the decision is final.